658/89A Mahawela Gardens, Baseline Rd, Colombo 00900 +94 11 267 9502 +94 11 269 2949 powerlogiceng@sltnet.lk

Home / Services / Partial Discharge Analysis

SERVICE 10 / 12 — SERVICE

Partial Discharge Analysis

PD TESTING — MV PLANT
Engineer performing partial discharge testing on an 11kV switchgear panel with a handheld PD instrument
Partial discharge measurement on live MV switchgear — insulation defects found before they become faults.

Overview

Partial discharge is the small electrical breakdown inside insulation that grows, silently, into a full failure. PLE's PD testing locates those defects in transformers, switchgear, power cables and MV machinery while the plant is still in service condition — so the repair is planned, not an emergency.

What it includes

  • Partial discharge testing of transformers
  • PD testing of switchgear and power cables
  • PD testing of MV machinery
  • Findings reported with recommended action

Details

Applies toTransformers, switchgear, power cables, MV machinery
PurposeEarly location of insulation defects
OutputTest findings with repair recommendation
PairedThermography (Service 11) for a full MV health check

Request a quotation

Ask PLE for a quotation on “Partial Discharge Analysis”. No prices are published — every job is quoted on rating, quantity and site.